Product is stored outside for delivery,  
Dispatchers will handle the delivery
schedule for the construction site and
the load is released from the truck to
the actual installation site. The
installation usually takes 10 - 30 minutes
.
That's it! Simple as that!
Commercial concrete units            Architectural steel frame design         Residential concrete or  
for apartment buildings                  is good for glass walls or other           wood is simple and fast
hotels, motels and hospitals          types of materials.                                 to install.  
                                                                          
Bottom pits are durable and           Concrete hoist ways sometimes      Transportation is usually   
quick to set in place.                        need special attention. Cuts are      done just in time for the
Re-bars are set too handle             made to order and designs may       installation storage is not
ground and other pressure.           vary!                                                     needed!