Product is stored outside for the
delivery, Sometimes there may be
delays at the site. Dispatchers
will handle the delivery schedule to the
construction site and load is released
from the truck to the
actual installation location. The
installation usually takes 10 - 30 minutes
.
Commercial concrete units            Architectural steel frame design       Residential concrete or
wood for Apartment building         good for glass wall or other design  steel units are simple and
Hotels  Motels and Hospital           product.                                                 fast to install.  
                                                                                              
usually quick to set in place.          need special attention, cuts are       JIT (just in time) for the
premanufactured concrete pit       made to order.                                    storing or installation.
is dry and ready to load.